According to the Ministry of Ecology and Environment, on November 5, 2018, the Central First Ecological Environmental Protection Inspector Group stationed in Jilin Province to carry out a “reviewâ€. In accordance with the requirements of the special supervision of the pollution problem in the Liaohe River Basin, the inspector team conducted on-site inspections on the rectification of the black and odorous water body of Xianrenhe River in Liaoyuan City.
In August 2017, the first round of central environmental protection inspectors took the issue of the treatment of the black and odorous water body of Xianren River as the focus of the inspector. The inspector pointed out that the pollution control project of the Xianren River in Liaoyuan City has not been implemented for a long time, and the central financial subsidy of 9 million yuan was overdue. To this end, the Jilin Province rectification plan requires that Liaoyuan City should complete the migration of the sewage pipe of the Xianren River before the end of December 2018, and eliminate the black and stinky water body of the Xianren River before the end of December 2019.
The inspector found that Liaoyuan City in the rectification of the black and smelly water body of Xianren River, the ideological understanding is not in place, the source control interception is seriously lagging behind, do surface articles, light practical effects, neither meet the requirements of black odor water remediation objectives, nor reach the inspector rectification Progress time.
The garbage and manure of the Xianren River are spread, and the masses are strongly reflected (Source: Ministry of Ecology and Environment)
Controlled source interception progress is slow. The sewage pipe network in the built-up area of ​​Liaoyuan City is old and the main line is not completely intercepted, and the overflow and leakage are serious. The proportion of rain and sewage is only 39.5%, which is far lower than the provincial average. It is the main cause of black odor in Xianren River. . The construction of sewage intercepting main pipe, the reformation of rain and sewage diversion, and the remediation of sewage inflow into the river are the main measures determined by the black and odor water remediation plan of Liaoyuan City. However, as of this “reviewâ€, the Xianren River 12 should be completed before the end of 2018. The migration project of the sewage intercepting main pipe is only 67%; the construction of the rainwater and sewage pipe network diversion project with a total length of 73 kilometers should be implemented, and construction will not start until July 2018, only 18 kilometers will be completed; 52 rain and sewage mixed along the river will be mixed. The discharge has not been banned or rectified so far. Inspectors have sampled and monitored the temporary sewage outlets on the west side of the Longshan District Government. The ammonia nitrogen concentration of the wastewater is as high as 20.7 mg/L.
The dredging and dredging work of the Xianren River has not yet been carried out (Source: Ministry of Ecology and Environment)
River rectification "light does not practice." The State Council's "Water Pollution Prevention Action Plan" requires that before the end of 2017, the city's black and odorous water bodies should have no large-scale floating objects on the river surface, no garbage on the river bank, and no illegal sewage discharge. The Liaoyuan City Government's Work Plan for Implementing the Water Pollution Prevention and Control Action Plan formulated by the Liaoyuan Municipal Government clearly clarifies the cleanup, dredging and dredging of the Xianren River. However, the inspector found that the above work was only on paper, in front of Huaying Hospital, Xixiaoqiao and other river sections, the water body was seriously black and stinking, floating garbage, manure, especially on the banks of the Chaohao karaoke section, all over the garbage, the scene Very unbearable. The inspector group randomly sampled and monitored the railway bridge section, and the ammonia nitrogen concentration was 11.5 mg/L, which was a black odorous water body. The task of eliminating the proportion of black and odorous water bodies by more than 80% before the end of 2018 is difficult to achieve.
The problem of perfunctory rectification is outstanding. Since May 2018, the Municipal Water Conservancy Bureau has implemented “dam-cutting and intercepting sewage†in the downstream rivers, using daily water pumps to raise about 5,000 tons of sewage from the river to the municipal pipe network, and reported to the inspection team that it can “minimize†Direct discharge of sewage from Dongliao River." However, the inspector found that the urban sewage treatment plant in Liaoyuan City has been overloaded for a long time. Nearly 20,000 tons of sewage can not be treated directly into the Dongliao River in the urban area. The black odorous sewage collected by the dam interception and collected into the municipal pipe network will still be finalized. Straight to the Dongliao River, just "pollution moving", did not play a pollution control effect.
Work drag and drop is not effective. Due to the continuous increase in the total amount of urban sewage, the existing sewage treatment capacity in Liaoyuan City is seriously insufficient. In September 2016, the Liaoyuan Municipal Clean Water Action Plan (2016-2020) issued by the Liaoyuan Municipal Government clearly implemented the new construction of the Liaoyuan Wastewater Treatment Plant (design capacity 50,000 tons/day). In June 2018, the Jilin Provincial Party Committee and the Provincial Government's "Liaohe River Basin Comprehensive Action Plan for Comprehensive Improvement of Water Pollution" made it clear that "Before the end of 2018, the sewage treatment plant that cannot handle the needs of the Liaohe River Basin should complete the expansion project." However, the project was not started until the inspector stationed in November 2018, and the progress was very lagging.
In this regard, the inspector team will further investigate and verify the relevant situation, and follow-up inspections in accordance with relevant requirements and procedures. In case of dereliction of duty, the local investigation and accountability will be required.
Editor in charge: Cao
This article is posted on the website for the purpose of transmitting more information and does not imply endorsement of its views or confirmation of its description.
Article source address: http://
Mascaras on the market are roughly divided into five types: precision mascara, waterproof mascara, thick mascara, lengthening mascara, and repair mascara. Faced with so many types, you can choose according to your own situation.
The precision mascara makes the eyelashes distinct, the waterproof mascara keeps you from taking off your makeup in the water, the thick lashes contain thick factors to make your eyes deep, and the fibers in the extended mascara make your eyelashes feathery. Flickering and energetic, repairing mascara can add luster to eyelashes and benefit the healthy growth of eyelashes.
The charming and crystal eyes, coupled with thick and long eyelashes, can make the entire facial makeup look vivid and delicate.
Therefore, the care and modification of eyelashes is very important. Use growth mascara to make the original dark, sparse and short eyelashes look black and long.
When choosing mascara, pay attention to the following aspects:
1. Mascara should be safe, harmless and non-irritating to the eyes. If it falls into the eyes accidentally during use, there should be no irritation.
2. Mascara should have a moderate gloss. After use, it will make the eyelashes dark and shiny, and produce better cosmetic effects.
3. The paste is even and fine, with moderate viscosity, is easier to apply, and adheres evenly, and the eyelashes will not harden or clump after use.
4. The mascara does not stick to the eyelids after drying, and is not afraid of being soaked by sweat, tears, and rain.
Mascara,Girls Need Waterproof Mascara,Long-Lasting Wear Mascara,Volumizing Mascara,Curling Mascara etc.
Mascara,Waterproof Mascara,Long-Lasting Wear Mascara,Volumizing Mascara,Curling Mascara
Jilin Xiangqi Technology Co., Ltd , https://www.xqccosmetics.com